P
piggyitm
Hey guys.I've just had a HSI prohibition order against some of my onsite temporary electrical installation work.
The crime :- Terminating an armoured cable fed from an RCD into a 45A PVC Switched Fuse Unit without a gland and using an earthclamp to bond the cable armourings via a 4mm Earth cable.
Please bear in mind the armoured cable was terminated with a gland into a metal box with the banjo and supplementary bond,all at the mains end.
Does anyone think that I should/could call this nitwit jobsworth and stick his prohibition notice up his ****?
The crime :- Terminating an armoured cable fed from an RCD into a 45A PVC Switched Fuse Unit without a gland and using an earthclamp to bond the cable armourings via a 4mm Earth cable.
Please bear in mind the armoured cable was terminated with a gland into a metal box with the banjo and supplementary bond,all at the mains end.
Does anyone think that I should/could call this nitwit jobsworth and stick his prohibition notice up his ****?