LADS,
I am due to start a re-wire in afew days. The height of the exising chopped in switches is 1350 to the top and the sockets are 310 to the top. The existing cable capping looks pretty good to tape and pull new cables down. But...have i got to chop new back boxes in at 1200 and 450 and get rid of the existing boxes???.
I am due to start a re-wire in afew days. The height of the exising chopped in switches is 1350 to the top and the sockets are 310 to the top. The existing cable capping looks pretty good to tape and pull new cables down. But...have i got to chop new back boxes in at 1200 and 450 and get rid of the existing boxes???.