saint
-
I have installed several domestic 3 and 4kW PV systems over the last five or six years and a few 10KW systems but i dont have experience with larger commercial installs. I have now been asked by a previous customer to provide an estimate to install a 30kW system on his factory. He has already had 30kW previously installed by another company that is no longer trading. I want dont want to get caught out with potential costs or issues i'm not expecting so if anyone can point out anything i should be considering that i may not have thought of i would be grateful. I'm ok with the install side of things with regards to panels/ mounting system/ inverters/ 3phase electrical works. But what about DNO permission and grid connection, Commercial EPC, export meter? anything else??
Many thanks
Many thanks