Hello everyone im NVQ level2 but has never done strobe lights that will turn on/off in rows.
I am working in an old ice house & its my next job but I have no real idea if each row will come from the same CB in the CU then split to make rows or each row on its own CB in the CU (circuit braker/CB) (consumer unit/CU).
also as NVQ level 2 can I rewire on my own without an electrician (just rewire only) or does one need to be on site as the labour boss of the ice house seems to think its ok to rewire & change how the 4floor house is to be wired? just a question as im ok with so much work but some feels like im not allowed yet untill I have part-p
Thanks...
Graham Blackburn (unemployed Grimsby)
I am working in an old ice house & its my next job but I have no real idea if each row will come from the same CB in the CU then split to make rows or each row on its own CB in the CU (circuit braker/CB) (consumer unit/CU).
also as NVQ level 2 can I rewire on my own without an electrician (just rewire only) or does one need to be on site as the labour boss of the ice house seems to think its ok to rewire & change how the 4floor house is to be wired? just a question as im ok with so much work but some feels like im not allowed yet untill I have part-p
Thanks...
Graham Blackburn (unemployed Grimsby)