S
sensible
Hi,
I have looked inside my Dad's Consumer Unit and I noticed that it has 2 RCD's but also 1 RCBO. I've seen these before but on my dads I was worried that it has to many (live) terminations into the bottom of the main switch? It has the usual 2 live conductors (wires) in it each going off to there respective RCD's but also a small busbar coming out of it to feed the RCBO. Is this ok? Or should it just have one wire conductor (from main switch) going off to one of the RCD's and then that RCD could feed the other one, meaning its not such a squeeze under the main switch (would just have busbar and one wire)?
I've tried to have a look at typical layouts (for the live feeds) of a high integrity unit but cant see any pictures of that.
Thankyou everyone..
I have looked inside my Dad's Consumer Unit and I noticed that it has 2 RCD's but also 1 RCBO. I've seen these before but on my dads I was worried that it has to many (live) terminations into the bottom of the main switch? It has the usual 2 live conductors (wires) in it each going off to there respective RCD's but also a small busbar coming out of it to feed the RCBO. Is this ok? Or should it just have one wire conductor (from main switch) going off to one of the RCD's and then that RCD could feed the other one, meaning its not such a squeeze under the main switch (would just have busbar and one wire)?
I've tried to have a look at typical layouts (for the live feeds) of a high integrity unit but cant see any pictures of that.
Thankyou everyone..
Last edited by a moderator: