B
BristolSpark
I start a new job next week, house bashing all surface trunking.
To all the guys that do this day in and day out is there a kind of system or set way to knock these out.
I imagine you have to keep everything exisiting live for as long as possible. what do you guys do about using existing trunking, or when lights are already centred in rooms.
what about the board change.
it would be interesting to hear what a few of you guys do, to knock these asap, any systems you use, or set ways on running cables, using existing trunking or conduit, and how you go about board change.
cheers
To all the guys that do this day in and day out is there a kind of system or set way to knock these out.
I imagine you have to keep everything exisiting live for as long as possible. what do you guys do about using existing trunking, or when lights are already centred in rooms.
what about the board change.
it would be interesting to hear what a few of you guys do, to knock these asap, any systems you use, or set ways on running cables, using existing trunking or conduit, and how you go about board change.
cheers