E
esc
Hi guys, i'm to replace a couple of cupboard luminaires, an extractor fan and a few SO fronts. They're all on the same circuit, RFC, the luminares and extractor are each on a 3A FCU. Being off the same circuit, can i put all these separate jobs/items on the one MWC?
Cheers
Cheers