B
bearlyable
Im to run cables in a renovation/new build which has stone walls on the outside then block work inner skin which is to be dry lined using dot and dab, should the cables be covered with channelling or conduit prior to the dot and dab being done or are they better just being left open and clipped to the wall..all constructive comments are appreciated as this is new too me. Cheers