Me and the Gaffer went to do some hv maintenance today, general inspections of the huts, the switchgear and transformers.
Check functionality of all the equipment etc etc.
first hut all goes fine, onto the next hut and find this....
all still live, with the remote functions not operating. Back to site tomorrow to have the DNO isolate from there side so we can safely isolate the equipment. Future job on the cards me thinks..... Haha.