H
Harry747
I am hoping one of you kind gentlemen can help. I am having the bathroom turned into a wet room which is being tanked Friday. I am also having a hydrotherapy bath installed. As the wiring up is not being done until after the tanking so the cable or cables need to be laid before the tanking starts as there will not be access to lay any cables afterwards. The hydro bath has two leads from it. I have attached photos of where the two leads come from. Could any of you please tell me what size cable should be laid under the tanking ready to be wired up when the electrician comes to do his bits. I am a disabled veteran and the British Legion is providing the tradesmen hence why I do not know who the electrician is yet to ask him. Many thanks in advance. Harry.