L
lofty84
State the regulation which requires holes to be made good to prevent the spread of fire?
can anyone tell me how i go about finding this please
also
As part of a repair you are required to run a new SWA cable from a consumer unit in a hall cupboard to a detached garage. State the materials which may be affected by your work and how you would make them good. Assume that you cannot use any existing cable routes?
· Down through floor finish (wood)
· Through screed (cement and sand)
· Through structural floor (concrete, earth)
· Then through brick walls to garage
thats my answer but i dont know what i would say in terms of makeing things good
can anyone tell me how i go about finding this please
also
As part of a repair you are required to run a new SWA cable from a consumer unit in a hall cupboard to a detached garage. State the materials which may be affected by your work and how you would make them good. Assume that you cannot use any existing cable routes?
· Down through floor finish (wood)
· Through screed (cement and sand)
· Through structural floor (concrete, earth)
· Then through brick walls to garage
thats my answer but i dont know what i would say in terms of makeing things good