Customer wants to sub-meter some circuits.
Existing situation is a 3 phase DB supplied by SWA, with 12 single phase circuits. 10 circuits are integral to the building and need to be metered for the tenent and 2 circuits feeding outbuildings which don't need to be metered.
Options are:
1) Meter the DB and then sub meter 2 circuits via a garage DB (maybe) - difference between the 2 will be charged to tenent 2 meters required 1 x 3 phase and 1 x single phase
2) Take supply from existing DB (63A probably) then put this into a new single phase DB (with integeral meter) and feed 10 circuits.
All a bit messy really, anyone have any other bright ideas?
Existing situation is a 3 phase DB supplied by SWA, with 12 single phase circuits. 10 circuits are integral to the building and need to be metered for the tenent and 2 circuits feeding outbuildings which don't need to be metered.
Options are:
1) Meter the DB and then sub meter 2 circuits via a garage DB (maybe) - difference between the 2 will be charged to tenent 2 meters required 1 x 3 phase and 1 x single phase
2) Take supply from existing DB (63A probably) then put this into a new single phase DB (with integeral meter) and feed 10 circuits.
All a bit messy really, anyone have any other bright ideas?