G
g-davies
We have been asked to do a EICR on a small scale industrial installation.Am I correct in thinking that the inspection and testing should only involve the fixed wiring,(that involving small power,lighting,and supplies to machinery)but not such things as emergency stop circuits etc,fed from control panels etc.