J
Jester77
What is the definition of premises with regards to where the main bonding should go?
I live in a 4 stroy mid terrace house. The road is level with 1st floor. There is a small sun-con courtyard with a path/bridge from the road to the front door on the 1st floor. The services run under the path. The water stoptap is approx half way along the water pipe. The house side of the stoptap is where the current 6mm earth bond is (needs up'd to 10mm) The CB is the other side of the wall ie in the house. Inside the house the water pipe has been plastered over.
So do I need to dig the pipe out and earth once it is in the house or is replacing the 6mm with 10 under the path acceptable?
I live in a 4 stroy mid terrace house. The road is level with 1st floor. There is a small sun-con courtyard with a path/bridge from the road to the front door on the 1st floor. The services run under the path. The water stoptap is approx half way along the water pipe. The house side of the stoptap is where the current 6mm earth bond is (needs up'd to 10mm) The CB is the other side of the wall ie in the house. Inside the house the water pipe has been plastered over.
So do I need to dig the pipe out and earth once it is in the house or is replacing the 6mm with 10 under the path acceptable?