- Joined
- Jan 21, 2011
- Messages
- 581
- Reaction score
- 34
hello
after some advice, need to replace existing 16mm tails as part of a consumer unit change. Existing tails appear to be run in cavity for 1 m to existing fusebox mounted on interior wall, from external meter cupboard.
intend to pass new 25mm tails & 16mm main earth thru the cavity wall, within external meter cupboard. ( protected by conduit ) and then run on the surface internally to new Consumer Unit ( 2x2 trunking )
my question is regarding drilling a new 25mm hole in the back of the meter cupboard, so i can access the cavity and then drill thru the internal wall, is this permitted ? or will i have to use one of the pre existing knockouts on the side which are not suitable for using conduit as protection for the tails and are located in the wrong place. The DNO is Western Power East Midlands
many thanks
after some advice, need to replace existing 16mm tails as part of a consumer unit change. Existing tails appear to be run in cavity for 1 m to existing fusebox mounted on interior wall, from external meter cupboard.
intend to pass new 25mm tails & 16mm main earth thru the cavity wall, within external meter cupboard. ( protected by conduit ) and then run on the surface internally to new Consumer Unit ( 2x2 trunking )
my question is regarding drilling a new 25mm hole in the back of the meter cupboard, so i can access the cavity and then drill thru the internal wall, is this permitted ? or will i have to use one of the pre existing knockouts on the side which are not suitable for using conduit as protection for the tails and are located in the wrong place. The DNO is Western Power East Midlands
many thanks