New to the forum. Been around a little while viewing and can usually find the answers I need, but not on this occasion.
Currently have an intermediate switch on the top of the landing and after decorating have purchased a new switch, though the terminals are labelled different.
Makes you think that at the very least the continuity of cpc could do with checking out throughout the circuit, and any other circuit the installer has had their paws on.
Makes you think that at the very least the continuity of cpc could do with checking out throughout the circuit, and any other circuit the installer has had their paws on.
New, and very poorly done for that matter wiring into an old switch. What exactly is going on here? That needs sorted out, sort out the Earths and sleeve that blue it's burning my eyes looking at it
The way that the plastering has been done with the switch plate in situ bugs me. Like papering and painting around sockets and switches, get them off the wall first!!!
I think what Murdoc was getting at is that usually there would be 2 x 3 core and earth cables going into an intermediate switch as there would be a conductor linking the coms of the other 2 way switches.
There could be a single linking them but also the earth may be getting used for that which would need to be changed.
I think what Murdoc was getting at is that usually there would be 2 x 3 core and earth cables going into an intermediate switch as there would be a conductor linking the coms of the other 2 way switches.
There could be a single linking them but also the earth may be getting used for that which would need to be changed.
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc