Ok so, im following on 2nd fixing from someone else who has first fixed a loft conversation. He's no longer with us.
At the top of the stairs I have an intermediate SW to go in consisting of 2 X 3 cores (intermediate SW with one 3 core going down stairs and another one down the hall) 2 X mains, 1 X load.
Another intermediate SW half way down the hall (2x 3 cores) a switch at the end(3 core) and a switch at the bottom of the stairs (3 core)
I wouldn't have wired it this way myself (not saying it's wrong) but I've never feed an intermediate before with another intermediate.
At first glance today I was like how do I connect that. Any takers?
At the top of the stairs I have an intermediate SW to go in consisting of 2 X 3 cores (intermediate SW with one 3 core going down stairs and another one down the hall) 2 X mains, 1 X load.
Another intermediate SW half way down the hall (2x 3 cores) a switch at the end(3 core) and a switch at the bottom of the stairs (3 core)
I wouldn't have wired it this way myself (not saying it's wrong) but I've never feed an intermediate before with another intermediate.
At first glance today I was like how do I connect that. Any takers?