C
chopper
out of interest , if a DB is fed with armoured cable using the starnds as earth which is fed from a main isolater which is on a TNCS supply, to carry out the IR would i have to dissconnect the neutral out of the main isolter ( not on the DB ) and the earth fly lead off the banjo. when testing N to E. WoULD I ALSO have to dissconect the fly leads from the rcbo ( earth and neutral ) then i could simply test from load side of rcbo to earth terminals.
doing the above this would mean i could also test L TO N on load side of rcbo
and L to E stRAIGHT FROM LOAD SIDE OF rcbo and earth terminals
am i thinking right, i went to job today gaffer says me and him will be testing it so i was trying to think on how he would probly do it for the best way, it was a 16 way 3 phase so be loads to dissconnect
doing the above this would mean i could also test L TO N on load side of rcbo
and L to E stRAIGHT FROM LOAD SIDE OF rcbo and earth terminals
am i thinking right, i went to job today gaffer says me and him will be testing it so i was trying to think on how he would probly do it for the best way, it was a 16 way 3 phase so be loads to dissconnect