Hi all
I am after some advice on an installation I have coming up.
Its a new TP+N circuit in SWA (13m run clipped direct) for a 22kW Tesla wall charger.
I will be installing a Matt:e unit upstream to provide regs compliant RCD protection & Open Pen protection.
My main question is do I need to install an SPD for this circuit. I cannot find a unit that has SPD protection, meaning I can only install a separate unit (not possible due to space limitation) or install in the existing CU (an old TP+N Eaton CU) or leave it out completely.
Installing a separate SPD unit would mean a the circuit passing through a ridiculous amount of devices.
Main CU MCB ---> SPD UNIT (MCB + SPD) ---> Matt:e unit (MAIN SWITCH, RCD & O-PEN) ---> Wall charger
Any feedback would be much appreciated
I am after some advice on an installation I have coming up.
Its a new TP+N circuit in SWA (13m run clipped direct) for a 22kW Tesla wall charger.
I will be installing a Matt:e unit upstream to provide regs compliant RCD protection & Open Pen protection.
My main question is do I need to install an SPD for this circuit. I cannot find a unit that has SPD protection, meaning I can only install a separate unit (not possible due to space limitation) or install in the existing CU (an old TP+N Eaton CU) or leave it out completely.
Installing a separate SPD unit would mean a the circuit passing through a ridiculous amount of devices.
Main CU MCB ---> SPD UNIT (MCB + SPD) ---> Matt:e unit (MAIN SWITCH, RCD & O-PEN) ---> Wall charger
Any feedback would be much appreciated