- Joined
- Dec 28, 2008
- Messages
- 36
- Reaction score
- 5
I must run fp cable under floor perpendicular to Joists. i must drill holes in Joists and thread cable through. safe zone is 0.25 to 0.4 of span length. the Joists run as a continuous piece of wood from front wall to rear wall but are supported halfway by a wall underneath. should i therefore consider there to be a single long span giving two large drilling zones or instead two shorter spans measured from the intermediate supporting wall giving four smaller drill zones?