I was taught that the main bonding should be continuous, including from the water to gas for example. However I am struggling to find a reg that states that. Can anyone point me in the right direction?
I ask because I have an installation where the gas isn't bonded, despite being only 2 feet from the water (which is bonded). So the bonding needs extending to the water.
It also has a junction in the back of the airing cupboard where it looks like some supplementary bonding has been joined in.
I am not too keen on replacing the 10m of 10mm back to the CU for the sake of it but will if it is deemed necessary. Is there actually a reg that says I need to?
I do need to get this one right as it is going to be assessed by elecsa in a couple of weeks time.....
I ask because I have an installation where the gas isn't bonded, despite being only 2 feet from the water (which is bonded). So the bonding needs extending to the water.
It also has a junction in the back of the airing cupboard where it looks like some supplementary bonding has been joined in.
I am not too keen on replacing the 10m of 10mm back to the CU for the sake of it but will if it is deemed necessary. Is there actually a reg that says I need to?
I do need to get this one right as it is going to be assessed by elecsa in a couple of weeks time.....