Just spent 2 weeks rewiring a 3 bed house, I made it ÂŁ500 cheaper to encourage the owners to move out which they did, thank goodness.... lived in rewires are a nightmare.

I finished the first fix a few days ago and the plasterer filled in all the chases as I was certain all was fine :D.

I then started my dead tests, got to the top landing and couldn't quite understand why the top landing switch only had a twin and earth going to it as it was 2 way with the first floor landing switch. Slowly, over a period of perhaps 5 or 6 seconds my heart dropped as I realised it was impossible to have a 2 way switch with only a twin and earth going to it, but I kept thinking.....there must be some way, of course there isn't, I just couldn't bear the thought of having to take all his plaster out and re-chase. I was exhausted. However, I did take his plaster out, floorboards back up, 3 core and E in, I was exhausted. Luckily the plasterer was fine about it and I am now having a beer having finished 2 weeks of hard work. :)

PS.. In the mild state of hysteria for the 5-6 seconds I (for a millisecond) considered using the earth as the link, tutt tutt, It shouldn't have even entered my head!
 
I was finishing off today, with the radio going, pretty bloody shattered.... then this song came on and I just had to stop and have a little jig around the house, I loved it! :D
 
---- happens. All part of life. Just finished wiring a small extension. Cable coming out of wall to right of door for outside light. Pull light out of box (supplied by customer) and it’s a lantern that when fitted at that point would be too high and hit soffit. Fortunately able to chase out 50mm or render and fit lower. ?
Spare a thought for plumber whose pipes for heated towel rail were spaced incorrectly. Facing having to remove tile and reposition pipes ?
 
Two weeks...we bash them out in two days, but there is more of us lol. I’ve got out of trouble before with a damaged 3 core and earth using a fibaro relay but had a neutral at switch as it was fed.
Ha... I gave you a little thought as I was driving home today Lee. I remembered reading a post of yours fairly recently about 3 men and 3 days for a 3 bed rewire. 2 bloody weeks it took me! :tired:
Although i guess that's much the same as you, 9 man days as opposed to 10.
 
Ha... I gave you a little thought as I was driving home today Lee. I remembered reading a post of yours fairly recently about 3 men and 3 days for a 3 bed rewire. 2 bloody weeks it took me! :tired:
Although i guess that's much the same as you, 9 man days as opposed to 10.
Haha....yeah I’ve done two in a 5 day working week before with a sparks mate and an apprentice, Proper graft though! I think you’ve done well to do it in that time frame on your tod....I’ve done a few on my own when I just come out my time and it’s hard work. I don’t know how you do it really as a hate working on my own like that...If I’ve got a lad with me least I can get him to run out to the van etc.
 
It
Just spent 2 weeks rewiring a 3 bed house, I made it ÂŁ500 cheaper to encourage the owners to move out which they did, thank goodness.... lived in rewires are a nightmare.

I finished the first fix a few days ago and the plasterer filled in all the chases as I was certain all was fine :D.

I then started my dead tests, got to the top landing and couldn't quite understand why the top landing switch only had a twin and earth going to it as it was 2 way with the first floor landing switch. Slowly, over a period of perhaps 5 or 6 seconds my heart dropped as I realised it was impossible to have a 2 way switch with only a twin and earth going to it, but I kept thinking.....there must be some way, of course there isn't, I just couldn't bear the thought of having to take all his plaster out and re-chase. I was exhausted. However, I did take his plaster out, floorboards back up, 3 core and E in, I was exhausted. Luckily the plasterer was fine about it and I am now having a beer having finished 2 weeks of hard work. :)

PS.. In the mild state of hysteria for the 5-6 seconds I (for a millisecond) considered using the earth as the link, tutt tutt, It shouldn't have even entered my head!
It has entered my head before as well. Just didn't have the heart to go through with it
 
Did loads of rewires,its really hard work,& to be honest never really found it satisfying,money is always tight,& no way relevant to all the hard work you’ve put in,have a beer on me ?
Dunno...decent labourer on an empty house and good money can be earned.....not disputing its bloody hard work though! :)
 
Just spent 2 weeks rewiring a 3 bed house, I made it ÂŁ500 cheaper to encourage the owners to move out which they did, thank goodness.... lived in rewires are a nightmare.

I finished the first fix a few days ago and the plasterer filled in all the chases as I was certain all was fine 2.

I then started my dead tests, got to the top landing and couldn't quite understand why the top landing switch only had a twin and earth going to it as it was 2 way with the first floor landing switch. Slowly, over a period of perhaps 5 or 6 seconds my heart dropped as I realised it was impossible to have a 2 way switch with only a twin and earth going to it, but I kept thinking.....there must be some way, of course there isn't, I just couldn't bear the thought of having to take all his plaste nd re-chase. I was exhausted. However, I did take his plaster out, floorboards back up, 3 core and E in, I was exhausted. Luckily the plasterer was fine about it and I am now having a beer having finished 2 weeks of hard work.

PS.. In the mild state of hysteria for the 5-6 seconds I (for a millisecond) considered using the earth as the link, tutt tutt, It shouldn't have even entered my head!
2 whole weeks go slow job was it? :eek: :smilingimp::cool::)
 
Each rewire is different, always nice when you get that occasional easy one, that you can make a decent profit on. I recently rewired my sister in laws it was a nightmare, but its one of those jobs you have to do.

Solid flooring downstairs, floor to ceiling chases and wall lights too ?
Existing CU underneath a tiled bathroom floor with laminate flooring laid down in one of the rooms upstairs..
Ended up moving the CU into the attached garage, putting up 4x2 trunking in the garage and drilling back through the house into a skilling cupboard to route my cables round, had to carefully pull the laminate up along one edge of the bedroom then refit.
Took me around 8 days however they were sometimes 12 hour days.

Got a nice little two bed empty bungalow coming up soon, hopefully I can finish that in 3 days by myself.
 
Each rewire is different, always nice when you get that occasional easy one, that you can make a decent profit on. I recently rewired my sister in laws it was a nightmare, but its one of those jobs you have to do.

Solid flooring downstairs, floor to ceiling chases and wall lights too ?
Existing CU underneath a tiled bathroom floor with laminate flooring laid down in one of the rooms upstairs..
Ended up moving the CU into the attached garage, putting up 4x2 trunking in the garage and drilling back through the house into a skilling cupboard to route my cables round, had to carefully pull the laminate up along one edge of the bedroom then refit.
Took me around 8 days however they were sometimes 12 hour days.

Got a nice little two bed empty bungalow coming up soon, hopefully I can finish that in 3 days by myself.
Was a joke
 

Reply to Just finished a rewire...... exhausted! in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
376
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
944
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
601
  • Question
We just left it as it was, again the customer didn't seem too bothered, dont think she wanted me digging any further.
Replies
14
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top