Your boss says he thinks about 4mm that means he wants you to work it out, get the info on the panels, find out the rating and do your cable calcs and do them neetly so you can present them to him. Most panels only require about 3a so even 2 of them should only come to less than 10a, 1.5mm will carry way more than this.
13a spur at origin, fused down to 3a at the load.
13a spur at origin, fused down to 3a at the load.