Been asked to quote a job - total rewire of four flats. As individual flats it's all very straight forward, ring, lighting, shower etc. However UK Power networks are installing a new head and meters for the whole block on the ground floor.
Obviously the distance to the top flat is going to be at least 10 metres. In terms of bringing up the meter tails do I have to put in an isolator every 3m or what?
Obviously the distance to the top flat is going to be at least 10 metres. In terms of bringing up the meter tails do I have to put in an isolator every 3m or what?