G
georges
hi been asked to quote for installing 4 log cabins on a holiday park.its first one like this I have done there is 100a supply split into 4 separate meters on a pme.The longest submain is going to be around 100 meters have not been to site yet.I was going to fit 100ma time delayed on swa to each point bit over the top fuse swa to 20a mcb all heating shower cooker gas any thoughts?