I've just got back from looking at a job. He requires 6 3-phase machines installed throughout a workshop to supplement the 4 other machines. Very straightforward, until I saw the internal structure. Steel framed building with, what looks like, asbestos panels on the walls and ceiling / roof. Then each of the original machines are fed via Galv 20mm2 floor conduits, surface mounted with surface mounted 3-phase sockets !
Besides dropping some studding and running 50mm2 trunking to unistrut poles with isolators etc . What should I do about the original floor conduits ?