Righto not entirely sure what to do certification wise.
Job is upgrade of main earth and main bonding.
I was thinking an installation cert without a schedule of test results as I am not touching any circuits.
and secondary is this notifiable I'm thinking yes but may be wrong.
Never done this job on it's own before always been tagged onto a fuseboard change or additional circuit.
EDIT:
now i'm thinking.....
Zs at fuseboard would be required....
schedule of test results required then.
Job is upgrade of main earth and main bonding.
I was thinking an installation cert without a schedule of test results as I am not touching any circuits.
and secondary is this notifiable I'm thinking yes but may be wrong.
Never done this job on it's own before always been tagged onto a fuseboard change or additional circuit.
EDIT:
now i'm thinking.....
Zs at fuseboard would be required....
schedule of test results required then.