Hi all some advice please.
when it comes to main equipotential bonding can i run a 10mm2 from the met to the incoming water pipes and a sperate 10mm to the gas or does it have to be a single 10mm from met to gas and looped on to water pips? and also if the main equipotential bonding is in place do u still need to cross bond the central heating pips?
when it comes to main equipotential bonding can i run a 10mm2 from the met to the incoming water pipes and a sperate 10mm to the gas or does it have to be a single 10mm from met to gas and looped on to water pips? and also if the main equipotential bonding is in place do u still need to cross bond the central heating pips?