Im starting a re-wire of a top floor flat, they have run an 16mm T&E with a 6mm earth from the ground floor to the 3rd floor feeding the CU, replacing this cable is practically impossible as there is no way of getting down without going through other flats. Looking for some advice of how others have gotten around this?
Do I fit a small board at the main incoming downstairs and protect the cable with a time delayed RCD?