tomchester999

Maximum demand on a E.I.Certificate

New circuit added for sockets.

Do I put the max demand for the new circuit installed? or all circuits?

thanks

Tom
 
agree. i usually add up the total of the breakers then divide by 2. rule of thumb and all that.
 
and on the main breaker section for the RCD I put 30ma, then what for the breaking time? do i put the time i got in my rcd test results or 300ms??
 
on certs, for rcd trip time you put the values for x1 and x5, whichever readings are the highest of 0deg. and 180deg. some certs only ask for the x1.
 
Maximum demand on a E.I.Certificate

New circuit added for sockets.

Do I put the max demand for the new circuit installed? or all circuits?

thanks

Tom

i usually put 18kw on domestic.no reason why, just like the sound of it.do you think it really matters.youve only got whats available through the primary overcurrent device anyway.hopefully someone will enlighten us both
 
To do the job properly, you should do the full monty and apply diversity. I am crap at maths unless its the cost of 6 pints of lager. So the formula i have always been told to use is the following.

Add up the total rating of the MCBs and Fuses which are fitted, and times the figure by 0.4, shove that figure in the maximum demand box, job done. The Elecsa assessor has no problem with it either.

Cheers.............Howard
 
This months PE (Jan 2011) has a switched on Issue 19 which has a two page section (Assessing the maximum demand of a domestic electrical installation).This will clear up some questions and then make you ask so many more oh why oh why do I read these mags.
 
This months PE (Jan 2011) has a switched on Issue 19 which has a two page section (Assessing the maximum demand of a domestic electrical installation).This will clear up some questions and then make you ask so many more oh why oh why do I read these mags.

Cos they are free........:cool:
 

Reply to Maximum demand in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
291
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
800
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
828

Similar threads

  • Question
Gents has anyone done an application using the UKPN smart connect portal for a split phase supply and addition of multiple single phase battery...
Replies
0
Views
400
Max demand can normally be pulled from the meter on existing installations for commercial/industrial meters, cycle through the readings- its...
Replies
9
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top