Can anyone tell me if a MCC panel is covered by BSEN 60294 and therefore is excluded from the scope of bs7671 as far as the scope of any inspection and testing of the fixed wiring for the installation?
Thanks.
Thanks.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Mcc panels and their Appropriate standard in the UK Electrical Forum area at ElectriciansForums.net
So for the purpose of inspection and testing, only the wiring supplying the panel is applicable to bs7671 and the associated wiring to motor controls and VSD circuits are excluded from the scope of bs7671 and the fixed wiring testing?It is excluded from BS 7671 as it is a product, covered by the Low Voltage Directive and thus a product standard.
However, they would fall under the (BS EN) IEC 61439 series.
Not,
BS EN 60294:2012
Measurement of the dimensions of a cylindrical component with axial terminations
Motor control centreCan I ask your definition of MCC?
Is this a custom built control panel full of drives, plc, safety circuit etc?
I believe BS EN 60204 may be the correct regulations in question.
Querying if it’s to be included as the maintenance supervisor of the factory wants a condition report done to the whole site as it’s never had one in its existence (around 20-25 years old).My first question is who is asking and why, is this a insurance request for a condition report of the installation and/or are they asking for a risk assessment and inspection on the machinery, or are you just querying if its supposed to be included.
It often depends on the type of insurance cover that has raised the request as to what is required to satisfy them.
The fact the installation has had numerous alterations and additions to the wiring, DB’s piggybacked off other DB’s and the like with no sniff of a minor works or electrical installation certificate tells me all I need to know, that there’s not much maintenance logging or at least not much record keeping going on.I see, as already mentioned explain to him that your periodic condition report is limited as far as the machine supply only, any inspection and report on the machinery itself would be an independent body if that is not your field, he would then need to decide if he is after a risk assessment and/or condition report on the machines and whether some of this is covered by maintenance teams who may be looking after the machinery.
If he is a maintenance supervisor then can we assume he has a maintenance team who repair and maintain the machinery, there report logs and event/maintenance schedules will be probably what he is after to cover the machines or are the maintenance trying to pass the book because they don't won't the responsibility.
Motor control centre
Contains internal mcbs,fused, variable speed drives, contractors, overload relays and the like for conveyer machines for food packaging etc
Ha, depends how many have ----ed me off!How many 'contractors' do you keep in there at any one time ?
The fact the installation has had numerous alterations and additions to the wiring, DB’s piggybacked off other DB’s and the like with no sniff of a minor works or electrical installation certificate tells me all I need to know, that there’s not much maintenance logging or at least not much record keeping going on.
And they say the domestic sector of the industry is bad..........
Thanks for the feedback, much appreciated to all