Hi all

I wonder if any of you can help me as I am just trying to get going with PV and am on my assessment job

My NAPIT inspector has flagged up my handover pack/operation manual as needing a section on future building considerations and was a little vague as to what they were. I haven't been able to find much other guidance?

I have put down the following...
Possible Building Control/Planning Consents required for modification of the array
Modifications that may affect the structural integrity/loading of the roof
Maintaining a safe access/egress route to the panels
Avoiding shading of the array

Am I barking up the correct tree? And is there anything else I should add?

Many thanks in advance if you are able to help

Regards

Mark
 
he means like future roof works or extensions to the property so you could have .

say a tile needs replacing or a reroof so you need somthing in the handover pack to instruct them or point out safey issues.
 
Excellent.. Will add that in about roof repairs. Had included a bit about retiling the whole roof but was thinking more from a change in roof loading aspect, Think I might have been getting a bit carried away..
 
Our commissioning certificate has a simple paragraph that says:
Future Building Works
Any changes to the existing fabric of the building including the construction of extensions, annexes and the like as well as planting of trees and large shrubs could affect the performance of the Solar Panel Array.
 
Cheers fella's I have more than covered it then.... My lad and me fitted it in conjunction with a lighting rewire in about 5 days so i was feeling quite pleased for our first one.... I reckon I must have spent about another 3-4 days on the paperwork in total mostly with head in hands!... Ho hum, still at least it should be a bit simpler next time. I suppose the next challenge is trying to understand how the Green Deal obstacle course works...
 

Reply to MCS non conformance "Future Building Considerations" in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
704
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top