Hi all
I wonder if any of you can help me as I am just trying to get going with PV and am on my assessment job
My NAPIT inspector has flagged up my handover pack/operation manual as needing a section on future building considerations and was a little vague as to what they were. I haven't been able to find much other guidance?
I have put down the following...
Possible Building Control/Planning Consents required for modification of the array
Modifications that may affect the structural integrity/loading of the roof
Maintaining a safe access/egress route to the panels
Avoiding shading of the array
Am I barking up the correct tree? And is there anything else I should add?
Many thanks in advance if you are able to help
Regards
Mark
I wonder if any of you can help me as I am just trying to get going with PV and am on my assessment job
My NAPIT inspector has flagged up my handover pack/operation manual as needing a section on future building considerations and was a little vague as to what they were. I haven't been able to find much other guidance?
I have put down the following...
Possible Building Control/Planning Consents required for modification of the array
Modifications that may affect the structural integrity/loading of the roof
Maintaining a safe access/egress route to the panels
Avoiding shading of the array
Am I barking up the correct tree? And is there anything else I should add?
Many thanks in advance if you are able to help
Regards
Mark