V
VMan
Hey Guys,
so my calcs area as follows:
PV array is to be mounted <200mm above the roof surface in the central available roof area
Module Width 994 mm
Module length 1652 mm
No. Of Modules 9
PV Array Area 14.8 m2 (Aref)
The site is located in ---( Zone 3 Figure 1)
Building Ridge Height 10 m
Site is in hilly area (Use Table 2)
Site altitude is approximatly 160 m above sea level
Dynamic wind pressure 2954 Pa (qs) (Use Tabel 2)
Wind Uplift -1.3 (Cp,net) (Mounted >100mm <300mm from edge of roof)
Wind Downward pressure 1 (Cp,net)
Wind Force F= qs Cp net Ca Aref
Upward Force = 2954 x -1.3 x 1 x 14.8 = -56754 N = -56.8KN
Downward Force 2954 x 1 x 1 x 14.8 = 43657 N = 43.7 KN
So now i need kN/m2??
-56.8/14.8 = -3.84 kN/m2
43.7/14.8 = 2.95 kN/m2
Say i use 4 brackets per m2, so i take 2.95/4 = 0.73kN (each bracket must withstand 730N right??)
how do i find out if the brackets can take 730N???Click-fit just gave me there calculator, but the spreadsheet only allows upto 1038Nm2 where i have 2950Nm2!!!
Argh!!! any ideas where to go from here??
Do i need to calculate how many brackets are needed for MCS or would calculating wind & snow lods be sufficient then passing these onto the supplier to supply necessary brackets ect?
Thanks
so my calcs area as follows:
PV array is to be mounted <200mm above the roof surface in the central available roof area
Module Width 994 mm
Module length 1652 mm
No. Of Modules 9
PV Array Area 14.8 m2 (Aref)
The site is located in ---( Zone 3 Figure 1)
Building Ridge Height 10 m
Site is in hilly area (Use Table 2)
Site altitude is approximatly 160 m above sea level
Dynamic wind pressure 2954 Pa (qs) (Use Tabel 2)
Wind Uplift -1.3 (Cp,net) (Mounted >100mm <300mm from edge of roof)
Wind Downward pressure 1 (Cp,net)
Wind Force F= qs Cp net Ca Aref
Upward Force = 2954 x -1.3 x 1 x 14.8 = -56754 N = -56.8KN
Downward Force 2954 x 1 x 1 x 14.8 = 43657 N = 43.7 KN
So now i need kN/m2??
-56.8/14.8 = -3.84 kN/m2
43.7/14.8 = 2.95 kN/m2
Say i use 4 brackets per m2, so i take 2.95/4 = 0.73kN (each bracket must withstand 730N right??)
how do i find out if the brackets can take 730N???Click-fit just gave me there calculator, but the spreadsheet only allows upto 1038Nm2 where i have 2950Nm2!!!
Argh!!! any ideas where to go from here??
Do i need to calculate how many brackets are needed for MCS or would calculating wind & snow lods be sufficient then passing these onto the supplier to supply necessary brackets ect?
Thanks