B
brizospark
Currently working on a large commercial renovation where the joiners are putting up new partition walls, double sheeted each side.
We have got the joiners to put dwangs in place for us to mount our socket back boxes (metal KO boxes 35mm)
As per the drawing we basically mounted the sockets back to back on the dwang and plan to drill through the dwang to link the sockets which are on the same circuit.
However, today the site agent came to see us and claimed that sockets should never be mounted back to back
Can anyone tell me the reason for this?
We have got the joiners to put dwangs in place for us to mount our socket back boxes (metal KO boxes 35mm)
As per the drawing we basically mounted the sockets back to back on the dwang and plan to drill through the dwang to link the sockets which are on the same circuit.
However, today the site agent came to see us and claimed that sockets should never be mounted back to back
Can anyone tell me the reason for this?