hi,
i run across those things once on a big building site.
havent got idea how they are called, cant find it either electrifix, toolstation or tlc catalogues.

they are kind of yellow plastic frames. they go between accesories (sockets switches etc) and newly installed boxes in the walls. you can wire them up right after your first fix. then plasterers tilers or painters can do their job on the wall, and after they finish you get them frames off and tighten already wired socket. saves lots of time and boxes are nice and tidy inside.

cheers
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
wild east london

Thread Information

Title
metal flush box protection between first and second fix
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
2
Unsolved
--

Advert

Thread statistics

Created
amlu,
Last reply from
amlu,
Replies
2
Views
1,875

Advert

Back
Top