B
Ben Butcher
Hello All,
Just a quickie, I am working on a large house renovation and it has had a new 3 phase supply installed by Western Power. EDF are coming to fit a meter to said supply on friday but I have been informed by EDF's office that he will insist on seeing a certificate for the installation. Fair enough although the install is (very) incomplete so as far as he's concerned all there is is a 100amp 3 phase isolator that I installed so that he had something to connect to. My question is what will he want? Basically the only test I can do is an IR test isn't it? all other tests are either on the individual circuits or live tests (eg Ze) which of course I can't access yet. I haven't installed main bonding because the water/gas main are not in and the schedule of inspections is going to look a little 'skinny' to say the least. Any help or experience would be gratefully read. Cheers BB.
Just a quickie, I am working on a large house renovation and it has had a new 3 phase supply installed by Western Power. EDF are coming to fit a meter to said supply on friday but I have been informed by EDF's office that he will insist on seeing a certificate for the installation. Fair enough although the install is (very) incomplete so as far as he's concerned all there is is a 100amp 3 phase isolator that I installed so that he had something to connect to. My question is what will he want? Basically the only test I can do is an IR test isn't it? all other tests are either on the individual circuits or live tests (eg Ze) which of course I can't access yet. I haven't installed main bonding because the water/gas main are not in and the schedule of inspections is going to look a little 'skinny' to say the least. Any help or experience would be gratefully read. Cheers BB.