adam.h

Wasnt sure what section to put this in as I have a few general questions.

But a customer is having an extension with a new open plan kitchen. Their current CU doesnt meet 17th ed. and said they could have it upgraded to a larger cu to meet but faults, barrowed neutrals could be present etc etc, though, it looks like it was only installed a fwe years back. They didnt want it to be touched, so will install a smaller second one, split the supply with a set of henley blocks, but how long can the meter tails be? I'm thinking they would need to be about a meter. Have two lights and ring on rcd side and then cooker / oven and smokes on non rcd side.
As the rest of the house will not be on an RCD then all pipes in the new kitchen will need to be bonded yes?

First job I am having to price up, and as I know them will do it for next to nothing, but for a kitchen / dining room plus, with downlights and some patio floor lights, (roughtly about ÂŁ450 for materials) labour, by the hour?
Someone mentioned charge about 1 to 1.5 for the whole lot, I was going to say less than 1k.
Another spark they had lined up they said was was going to "cost thousands" they said.

O yea, kitchen sinks, cant find any thing in the regs about distance for a socket from a sink. I have seen a few pretty close to sinks which I though was a bit tooo close. Anyone know where is say's about this? In the OSG I see the bathroom sink is not in a zone.

Lot of questions I know. Cheers.
 
Hi

Tails can be up to 3m long.

Pipework should be bonded anyway!

Sockets must be at least 300mm from the edge of the sink, and it states this in the building regs!

As for price how long do reckon the job will take?
 
Last edited:
3m, thats good. lol

I was going more along the lines of supp bonding under the sink?

Must have missed the sockets by a sink. I'll have to have another look through the regs, you know where abouts is states this by any chance?

I can't see it taking to long to do. Seeing as it will all be bare it will be an easy install. probably no more then a weeks work all in tota I reckon, if thatl. But I guess you can never really tell until they make up their mind 100% where they want things to go and dont change their mind half way through :p
Cheers
 
It's in the electricians guide to the Building Regualtions, I only have the 16th ed here and it's on page 57. I know it hasn't changed.

With regards to bonding, I'd bond anyway it's just good practice.

A lot of sparks on here charge at a day rate of around ÂŁ160/day, and then add on the materials, travelling costs etc. If it's a weeks work, I'd be looking at around ÂŁ1100 - ÂŁ1200.

Hope this helps!
 
Cool only seemed to find hight for sockets in OSG so will have a looksy.

Yea, always thought it best top bond pipework near sinks. Though Plastic piping seems to be favoured these days which is handy :p
I'll be able to walk to this job, only down the road hehe.
I like to check, then double check any thing I do lol. So cheers for all the info.
 
The Electricians Guide To the Building Regs is just that...... a guide.

Although it states min 300mm it is not a hard and fast rule.

Any electrical accessories, where ever they are installed, should be suitable for its environment.

The 300 "rule" is generally accepted as being errrrr.... acceptable.
 

Reply to meter tails / kitchen bonding / pricing in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
300
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
812
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
865

Similar threads

In the 80's I was taught that with PME earthing arrangements we used 16mm for the main earthing conductor, some went a bit crazy and were bonding...
Replies
11
Views
2K
Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top