Hi guys, Looked at a job yesterday, for a rewire.
The CU will need to be moved as when customer had her Gas installed they kindly put the gas meter 1inch away from the CU.
Alarming to me, i told her that it needs to be moved to a more appropriate place to meet requiremnets. Her Electric meter is on the same wall but far away enough to meet requirements of being away from the Gas meter and Gas pipe work. But no room elsewhere to move the CU on same wall.
She was happy as she has a slight disability so if a breaker trips then rather than climbing into cupboard, all she has to do is open door and do what she needs to do (in a sence)
Anyway thats the insight of the concern.
I just want conformation to my idea that, the tails will end up being just over 3 meters from the Meter, so will have to have a isolation switch.
But can i run the metre tails and the main Earth (CPC) in plastic trunking, big enough to have room for requirments. It may either run from top of meter over in corners on ceiling in cupboard or along floor, wall, then up to CU.
can this be done, or does it need to be something more stronger for protection etc etc...
Thanks guys....
The CU will need to be moved as when customer had her Gas installed they kindly put the gas meter 1inch away from the CU.
Alarming to me, i told her that it needs to be moved to a more appropriate place to meet requiremnets. Her Electric meter is on the same wall but far away enough to meet requirements of being away from the Gas meter and Gas pipe work. But no room elsewhere to move the CU on same wall.
She was happy as she has a slight disability so if a breaker trips then rather than climbing into cupboard, all she has to do is open door and do what she needs to do (in a sence)
Anyway thats the insight of the concern.
I just want conformation to my idea that, the tails will end up being just over 3 meters from the Meter, so will have to have a isolation switch.
But can i run the metre tails and the main Earth (CPC) in plastic trunking, big enough to have room for requirments. It may either run from top of meter over in corners on ceiling in cupboard or along floor, wall, then up to CU.
can this be done, or does it need to be something more stronger for protection etc etc...
Thanks guys....