Hi all,just a quick question.If you got called out to a consumer change & you found at some point somebody pulled the main fuse to install a henley block to split the tails to fit a small shower cu all done correctly including 25mm2 tails from the henley block to the small cu,but before the henley block the tails from the meter to the block are undersized (not 25mm2 maybe 16mm2).is it the responsibility of the consumer to change these or the supplier,If it is the consumer as supposedly (everything from the meter forwards)what would the procedure to change them because obviously the meters all crimped up apart from cutting these & taking the front off the meter to get to the tails.Should this be the job of the supplier to upgrade them after a phone call to them
cheers jason
Hi all,just a quick question.If you got called out to a consumer change & you found at some point somebody pulled the main fuse to install a henley block to split the tails to fit a small shower cu all done correctly including 25mm2 tails from the henley block to the small cu,but before the henley block the tails from the meter to the block are undersized (not 25mm2 maybe 16mm2).is it the responsibility of the consumer to change these or the supplier,If it is the consumer as supposedly (everything from the meter forwards)what would the procedure to change them because obviously the meters all crimped up apart from cutting these & taking the front off the meter to get to the tails.Should this be the job of the supplier to upgrade them after a phone call to them
cheers jason
Last edited by a moderator: