Job is to install a spur of a RFC. Once installed I will issue minor works as should be done.
However, I was thinking, the r1+r2 value reading/test, is that from the spurred point or from the board?
Also another job I have is to replace some floor sockets that have been damaged. Sockets are on a RFC again however it looks like the feed comes out from mcb (single 4mm) into an rcd then 2x2.5 from the rcd load side. Would r1+r2 be from the board or the load side of rcd?