View the thread, titled "moaning" which is posted in Australia on Electricians Forums.

W

wattsup

Why if, line and neutral and line and earth are the same voltage do i need to do an rcd/rcbo tripping time. Why do I have to test others equipment? Why will the test button not suffice? Added, I can walk off site all tested ok, and 10 mins later a 'carpenter' can nail an earth wire and cut clean though.

Ahhh more money for test equipment...i get it now, forget the joiner


why don't they insist on load testing, for instance waiting to see how long it takes to trip a 6A breaker when loaded with 8 amps or whatever....wow that would even better ca-ching

wont be long...if a rewirable fuse I may have to wait 6 months ...ca-ching -;)
 
Last edited by a moderator:
Why if, line and neutral and line and earth are the same voltage do i need to do an rcd/rcbo tripping time. Why do I have to test others equipment? Why will the test button not suffice? Added, I can walk off site all tested ok, and 10 mins later a 'carpenter' can nail an earth wire and cut clean though.

Ahhh more money for test equipment...i get it now, forget the joiner


why don't they insist on load testing, for instance waiting to see how long it takes to trip a 6A breaker when loaded with 8 amps or whatever....wow that would even better ca-ching

wont be long...if a rewirable fuse I may have to wait 6 months ...ca-ching -;)

Never heard of disconnection times?
Why would the Earth be at the same voltage as live?

In: its nominal rating
I1: its non-fusing/non-tripping current.
I2: its fusing/tripping current.
 
Last edited by a moderator:
Why if, line and neutral and line and earth are the same voltage do i need to do an rcd/rcbo tripping time. Why do I have to test others equipment? Why will the test button not suffice? Added, I can walk off site all tested ok, and 10 mins later a 'carpenter' can nail an earth wire and cut clean though.

Ahhh more money for test equipment...i get it now, forget the joiner


why don't they insist on load testing, for instance waiting to see how long it takes to trip a 6A breaker when loaded with 8 amps or whatever....wow that would even better ca-ching

wont be long...if a rewirable fuse I may have to wait 6 months ...ca-ching -;)
the test button will not surfice as a test as it does not tell you that the rcd is tripping within the required time. I have seen test buttons work but yet the rcd to be faulty
 

Reply to the thread, titled "moaning" which is posted in Australia on Electricians Forums.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
moaning
Prefix
N/A
Forum
Australia
Start date
Last reply date
Replies
4
Unsolved
--

Advert

Thread statistics

Created
wattsup,
Last reply from
acat,
Replies
4
Views
1,432

Advert

Back
Top