T
tomhames
Hi everyone,
I am currently developing a meter monitoring product, and I am required to test the product on all of the different electric meters, electromechanical and digital, that are used in the UK. To do this normally would obviously waste a lot of electricity as I am required to run them at a high volume for extended periods of time.
Does anyone know of a way that i could speed up the meters (safely) allowing me to put less electricity through the meters?
Also, as i own the meters any permanent modifications will be fine, but preferably the cheaper the better!
Cheers!
I am currently developing a meter monitoring product, and I am required to test the product on all of the different electric meters, electromechanical and digital, that are used in the UK. To do this normally would obviously waste a lot of electricity as I am required to run them at a high volume for extended periods of time.
Does anyone know of a way that i could speed up the meters (safely) allowing me to put less electricity through the meters?
Also, as i own the meters any permanent modifications will be fine, but preferably the cheaper the better!
Cheers!