When would you require a moulded casing fuseboard?
Theres one submain B50 single phase board.
One c16 and one c6 and 7 c32 triple pole mcb's it's a 8 way 3-phase board and looking at putting a 16 way in.
 
Depends tbh, there are a few advantages to using them and they can have adjustable setting which you may require as well as allowing for larger cables to be terminated also you can connect them direct to trip circuits with a few add ons so you can utililise a trip if an E-stop is hit or even a mA leakage sensor etc etc, they are also housed in very roomy cabinets if you have a power panel and can allow for supply upgrade etc without the need to start again and allow for many large swa's trunking systems etc that may be cramped in a smaller standard board.

They can replace the need for a busbar and fused isolator arrangement thus becoming cost effective too so really its down to the layout of your distribution as to the need to use them.
 
Ok cheers, basically it's the main db, the following is the circuits
X1 c16 sockets
x1 c6 lights
x1 b50 single phase db
x7c32 each to 415v sockets for welding sets

100a supply fuse per phase

same time I change the fuse board I will be adding another x2 c32 415v circuits for welding sets

so from what I've been told on here and other advise I only need moulding casing when the consumer unit supply's alot of sub mains or high load.
 
You need MCCB's (note the conventional term) when you need a feature that you can't get from an ordinary MCB to BS EN60898 etc. Or, if you anticipate that such a feature will be needed in future, there might be reason to choose an MCCB panel now. As mentioned above, this could be any or all of: high or adjustable In, high Ics, auxiliary actuators / contacts, cable marshalling facilities etc.
 
like lucien says, we had a mccb panel that had a couple em stop circuits connected to it to shut power off.

you can do a lot of clever things that you can do with standard breakers even remotely operate them over the network, for example you could remotely reset a tripped breaker or tell what state it is in.

this can be setup to send an alert to the oncall engineer without any human intervention
 

Reply to Moulded casing 3 phase fuseboard in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
811
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
857

Similar threads

  • Question
Wallbox Fuse Box Lite Single Phase has anyone used one of these? I've installed one feeding a Pulsar Max, the Pulsar Max is set to 32Amp max. The...
Replies
0
Views
529
Just stick the 63amp fused connector before the Henley block , or Lucy block as you call it, and your all good, as for your 2nd point, , the...
Replies
1
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top