S
spudysparks
Hi all , A guy is having a new extension done in his house and wants the old CU removed and replaced in a different location 10 meters away , my question is should I make the old tails off into a 9x9 addaptable box withe dim rail connectors and then back to the new CU or through crimp the old tails ( because you only need access to screw connections ) and bury them in the wall , all cicuits will be RCBO protected, Sorry I should have said ,the old tails from the old circuits , EDF will move the head to wher the new CU will be placed ,
Last edited by a moderator: