Just done a search on this question and couldn't find a comparable thread.

Done 2 different jobs this week and starting the paperwork, and I'm thinking using MWC for the 2 following jobs:

1) Change 16A B type MCB with C type - changed infra red heater in a church with a new 'patio' heater - instructions recommended C type (B type did trip occassionally)

2) Replace old Earth Leakage Breaker (between meter and CU) with 30mA RCD - I know about 314.1 - but this is an interim 'fix'

As I see it using MWCs as these were only alterations to an installation.

Anyone disagree? Somewhere I think I read that changing overcurrent device needed an EIC but can't find reference to it!
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Dorset

Thread Information

Title
MWC or EIC
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
6
Unsolved
--

Advert

Thread statistics

Created
yellowvanman,
Last reply from
Guest55,
Replies
6
Views
1,061

Advert

Back
Top