walec
I am now in a postion to apply to join a relevant body for Part P approval.
The CU in my house needs replacing (actually there are currently two as extensions have been added over the years) I will put in a new RCD split board but
I am unsure about the feed to the garage which is away from the house. If I supply the garage from the house do I then put an RCD in the CU in the garage, or do I go directly to a switch in the garage and then go to the CU.
I could put a seperate RCD switch in as there are already two sets of tails.
Just want to know the best way which conforms to 17th
Thanks
The CU in my house needs replacing (actually there are currently two as extensions have been added over the years) I will put in a new RCD split board but
I am unsure about the feed to the garage which is away from the house. If I supply the garage from the house do I then put an RCD in the CU in the garage, or do I go directly to a switch in the garage and then go to the CU.
I could put a seperate RCD switch in as there are already two sets of tails.
Just want to know the best way which conforms to 17th
Thanks