Just received this:
I would suggest we all reply to keep it the same.
In my opinion > 50kW requires different expertise and would normally be an M&E type contract, don't let these guys scope creep into commercial areas, the whole design and contract process is very different above 50kW.
Same for thermal, though perhaps 100kWTh and a single boiler of up to 100kWTh may be appropriate.
MCS is not necessary for the larger jobs and is already well covered by the H&S At Work Act etc, duty of care etc
The Microgeneration Certification Scheme published a one month consultation on MCS scheme thresholds and 70kWth Application Guidance document on Friday 18[SUP]th[/SUP] September. The deadline for submitting comments is Friday 30th October 2015. For further information please click here.
I would suggest we all reply to keep it the same.
In my opinion > 50kW requires different expertise and would normally be an M&E type contract, don't let these guys scope creep into commercial areas, the whole design and contract process is very different above 50kW.
Same for thermal, though perhaps 100kWTh and a single boiler of up to 100kWTh may be appropriate.
MCS is not necessary for the larger jobs and is already well covered by the H&S At Work Act etc, duty of care etc