The meter is the supply?
I wouldnt be allowed to split the cutout.
Only our supplier can do that I thought.
The Ib hasn't been worked out yet.
We are mid renovation and I'm undecided on supplies.
The db at present supplies the conservatory garage and shed.
This is the reason I'm asking for help.
The shed will have a hobby lathe, pillar drill, arc welder etc.
The garage will be a gym and house the tumble dryer.
The conservatory will use a 2kw heater at some stage.
So far, I know I need an MCB for overload, 3 core SWA using The PME.
The garage db need an rcd or each circuit on rcbo.
I wouldnt be allowed to split the cutout.
Only our supplier can do that I thought.
The Ib hasn't been worked out yet.
We are mid renovation and I'm undecided on supplies.
The db at present supplies the conservatory garage and shed.
This is the reason I'm asking for help.
The shed will have a hobby lathe, pillar drill, arc welder etc.
The garage will be a gym and house the tumble dryer.
The conservatory will use a 2kw heater at some stage.
So far, I know I need an MCB for overload, 3 core SWA using The PME.
The garage db need an rcd or each circuit on rcbo.