Booked for a CU change, the customer rang me up today. When I do their change can I do a job for her neighbour. The neighbour has recently had a new CU but the "electrician" who did it said he could only give her a partial certificate because the property wasn't earthed. WTF???

The message may have got garbled in the retelling so I'll find out for sure what's going on when I get there.

PJ
 
sounds like a Electrical Trainee has managed to fit a CU without checking earthing.perhaps he was sleeping through the 10 minute lesson on earthing and bonding. how the hell has he managed to get any testing done then? see what the crack is and let us know.
 
Had a high ZE on a job I was doing . Reported to DNO guy came out within an hour checked and confirmed out of speck made report to office. Week and half later guys came out dug up road and so say improved Ze from 1.7 Ohms to 0.7 Ohms. Went back to job to complete tests disconnected 16mm earth from earth block and cable fell out of clamp. Phoned them up again and had a guy out in half hour who fits new clamp with lug. Says there you go I test with my 1730 and reading is 1.02 Ohms, I say still not right. He then speaks to his office and two days later another hole in the road and this time bonded across the joint and 0.2 Ohms was able to finish the testing only took couple of weeks with client on my back.
 
Had a high ZE on a job I was doing . Reported to DNO guy came out within an hour checked and confirmed out of speck made report to office. Week and half later guys came out dug up road and so say improved Ze from 1.7 Ohms to 0.7 Ohms. Went back to job to complete tests disconnected 16mm earth from earth block and cable fell out of clamp. Phoned them up again and had a guy out in half hour who fits new clamp with lug. Says there you go I test with my 1730 and reading is 1.02 Ohms, I say still not right. He then speaks to his office and two days later another hole in the road and this time bonded across the joint and 0.2 Ohms was able to finish the testing only took couple of weeks with client on my back.
and this is why (and i`v said it before and i will say it..yet again) that a Ze should always be conducted upon being given the contract to carry out the works.....not during or after the install has been completed....
this gives time for any dodgy Ze to be dealt with....
 

Reply to No earth - 2 in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
385
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
966
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

It applies to commercial if it shares the same supply as a dwelling.
Replies
4
Views
578
I'm begining to think like this now, I very rarely work for builders anymore but the couple that I still do work for are the worst payers out of...
    • Like
    • Agree
Replies
8
Views
679

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top