G
GT1
Guys..
Got my own take on this.. however just wanted to run it past the others
Work is in a bathroom
Flood damaged..
As a result, refit of the bathroom required.
Work involved:
Dosconnect and then reconnect shower supply using existing supply (shower will be moved a few feet, and does not need any new cable)
Fit replacement light fittings. (ceiling being replaced, new lights chosen, no new cable)
I know it falls into that grey area about replacement for damage. Because the items being worked on werent directly damaged.. but nonetheless is a direct result of the flood.
Got my own take on this.. however just wanted to run it past the others
Work is in a bathroom
Flood damaged..
As a result, refit of the bathroom required.
Work involved:
Dosconnect and then reconnect shower supply using existing supply (shower will be moved a few feet, and does not need any new cable)
Fit replacement light fittings. (ceiling being replaced, new lights chosen, no new cable)
I know it falls into that grey area about replacement for damage. Because the items being worked on werent directly damaged.. but nonetheless is a direct result of the flood.